Case Studies
Purpose-built boiler cleaning design for a large-scale plant significantly extends operating time and prevents unplanned downtime. The completed project will use bituminous and sub-bituminous coal, and the latest, most modern, boiler design and on-load cleaning solutions. Read more.
When a boiler cleaning solution was required for the first 1000 MW unit in China, Shanghai Clyde Bergemann Machinery Co. Ltd. worked with client, Harbin Boiler Works, to deliver sootblowers of 17-metre travel capability. It was just the start of a close, working relationship to last into the future. Read more.
Installation of on-load boiler cleaning technology at the Jimah East Power Station, regarded as Malaysia’s most important power plant, was the first to use SMART Cannons, and a breakthrough in the efficiency improvements achieved, including reducing gas temperature at the furnace outlet by up to 100°C. Read more.
A close working relationship between customer and supplier means being able to work together on advanced on-load boiler cleaning solutions. In the case of Anhui Huaibei Pingshan Power Plant, this was for the first 1350 MW unit in China, that then went on to pass a 16-hour trial operation. Read more.